On September 16, 2007, a blowdown drum at the Valero Energy Corporation refinery in Port Arthur, Texas, exploded and ejected molten asphalt material. Fourteen workers were injured, three seriously. The blowdown drum was part of the delayed coker unit's asphalt blowdown system — a vessel designed to safely receive and depressurize process materials during unit upsets and shutdowns.
The CSB investigation determined that the blowdown drum failed due to overpressurization and structural failure when it was subjected to conditions beyond its design capacity. The sequence of events that led to the failure involved process conditions during an upset that directed more material to the drum than its design accounted for.
The incident highlighted the critical importance of properly sizing blowdown drums for all credible upset scenarios and ensuring that the actual operating conditions that can direct flow to the drum are fully characterized and reflected in vessel design.
This incident traced to breakdowns across 4 PSM elements (MI · PHA · SOP · PSSR). Each represents a documented gap that process safety documentation and consulting can close before a similar event occurs at your facility.