On September 22, 2001, two workers were killed and six others — including emergency first responders — were injured when a large anhydrous ammonia release occurred from the refrigeration system at the Atlas Cold Storage facility in Theodore, Alabama. Atlas Cold Storage operated a large cold storage and distribution facility that used an anhydrous ammonia refrigeration system.
The ammonia release originated from a failure in the refrigeration system piping or equipment. The released ammonia rapidly formed a toxic cloud inside the facility that immediately disabled workers in the area. Two workers died from ammonia exposure before they could be evacuated. First responders who arrived to assist were also exposed.
The CSB found deficiencies in Atlas Cold Storage's mechanical integrity program for the ammonia refrigeration system, as well as inadequate training for workers on the recognition and response to an ammonia release. The facility's emergency response plan had not been adequately implemented or tested.
This incident traced to breakdowns across 5 PSM elements (MI · SOP · TRN · EAP · PSI). Each represents a documented gap that process safety documentation and consulting can close before a similar event occurs at your facility.