SIMOPs Failure — Hot Work Fire in Physically Connected Confined Spaces
Evergreen Packaging Paper Mill Hot Work Fire
Evergreen Packaging LLC
📍 Canton, NC
Incident: September 21, 2020  •  CSB Report: September 24, 2021
2
Fatalities
Flammable FRP Resin and Solvents
Chemical / Hazard
8
CSB Recommendations
📋 Incident Summary

On September 21, 2020, a fire at the Evergreen Packaging paper mill in Canton, North Carolina, killed two Rimcor contractor workers inside a scrubber downflow tower. Universal Blastco workers were simultaneously repairing FRP lining using heat guns and flammable resin inside the adjacent upflow tower. A heat gun dropped into a resin bucket ignited a fire; Blastco workers escaped the upflow tower, but fire and smoke spread through an interconnecting crossover pipe to the downflow tower where the two Rimcor workers were killed.

The CSB found that Evergreen Packaging had treated the two physically connected towers as separate, independent confined spaces with no coordination between the contractor crews — a classic simultaneous operations (SIMOPs) failure. The towers were connected by a crossover line, but Evergreen and the contractors considered them separate. Evergreen's contractor orientation also defined hot work only as burning, cutting, brazing, or welding, so the heat gun was not treated as hot work.

The September 2021 CSB report issued 8 recommendations: 3 to Evergreen Packaging (all closed — facility subsequently closed), 2 to OSHA (closed/superseded), and 3 to Universal Blastco (all closed), focusing on SIMOPs coordination, connected confined space identification, and FRP repair flammable material controls.

🔎 Key Findings
Finding 01
Two Connected Towers Treated as Independent Confined Spaces
Evergreen Packaging permitted simultaneous contractor work in two scrubber towers connected by a crossover pipe, treating them as independent confined spaces — without recognizing that fire, smoke, and toxic atmosphere could propagate between them.
Finding 02
No SIMOPs Coordination Between Blastco and Rimcor Crews
There was no coordination between the Universal Blastco crew working with flammable FRP resin in the upflow tower and the Rimcor crew in the connected downflow tower — neither was aware of the other's activities or the shared hazard pathway.
Finding 03
Heat Gun Dropped into Resin Bucket — Fire Propagated Through Crossover Pipe
A Blastco worker dropped a heat gun into a bucket of flammable FRP resin, igniting a fire. Fire and smoke traveled through the interconnecting crossover pipe into the downflow tower where Rimcor workers were located.
Finding 04
Combustible Construction Helped the Fire Spread
The CSB found that combustible materials used to build the upflow tower and crossover line contributed to the quick spread of smoke and flames into the downflow tower, where the two Rimcor workers were fatally injured.
Finding 05
Heat Gun Not Recognized as Hot Work
Workers were using the heat gun to warm resin that was curing slowly in cool weather. The heat gun could exceed the resin's flash point and autoignition temperature, but because it made no spark or flame, Blastco workers did not recognize it as a hot work hazard.
🔍 Root Causes
1
SIMOPs Hazard Not Recognized — Connected Spaces Treated as Independent
Evergreen Packaging's confined space and hot work permit systems had no systematic process for identifying connected, non-independent spaces — the shared atmosphere and fire propagation pathway between the two towers was never recognized as a hazard requiring coordination.
2
No Simultaneous Operations Coordination Protocol
The facility had no formal SIMOPs coordination protocol requiring contractors working in physically connected spaces to coordinate work schedules, communicate active hazards, and share emergency response information.
3
Flammable Material Controls for FRP Repair Inadequate
Hot work permits and work procedures did not establish adequate controls to prevent ignition of flammable FRP resin from heat gun operations in a confined space — the dropped heat gun ignition was a foreseeable failure mode not addressed by existing controls.
☑ CSB Recommendations
→ Evergreen Packaging (R3, closed – no longer applicable)
Update contractor documentation, training, and orientation to reflect Evergreen's internal definition of hot work: any method of work that can serve as an ignition source.
→ Evergreen Packaging (R4, closed – no longer applicable)
Develop and implement a formal Simultaneous Operations (SIMOPs) program covering planned work close together in time and place, including hazard reviews, coordination, shared communication, and emergency response involvement.
→ Evergreen Packaging (R5, closed – no longer applicable)
Require emergency response personnel to be involved in planning work with flammable materials in confined spaces and stationed directly outside the space, trained and equipped for rescue and fire response.
→ OSHA (R1, closed)
Issue a safety information product addressing the analysis and control of hazards created by work activities inside permit-required confined spaces.
→ OSHA (R2, superseded)
Require owners and operators to coordinate simultaneous operations involving multiple work groups, including contractors. Superseded by a recommendation in the Wacker report.
→ Universal Blastco (R6, closed)
Update the hot work policy and training to identify heat guns as hot work and make clear that hot work includes any method that can ignite a fire.
→ Universal Blastco (R7, closed)
Develop a troubleshooting guide or procedure for resin and fiberglass matting in FRP work, including acceptable ways to address cold-weather resin performance.
→ Universal Blastco (R8, closed)
Develop a policy and procedures for the proper use of heat guns in FRP operations.

Full recommendation text and current status: CSB investigation page.

💡 Lessons Learned
Physically connected confined spaces are not independent — they share atmospheres, fire pathways, and hazard exposure. Any confined space entry program must identify connections between adjacent spaces before entry is permitted.
SIMOPs failures kill workers. When two contractor crews work simultaneously in connected spaces without coordination, each crew is unknowingly exposed to hazards created by the other. Facility owners bear responsibility for managing SIMOPs conflicts.
A dropped tool — a heat gun falling into a bucket of resin — was the immediate ignition trigger. Engineering controls preventing accidental ignition (secondary containment, tool tethering, physical separation) are essential when flammable materials are used near ignition sources in confined spaces.
Workers in the downflow tower had no warning and no escape route not blocked by fire. Emergency egress from confined spaces must account for fire and smoke propagation pathways from connected spaces.
Contractor coordination failures are a recurring theme in process safety incidents. Facility owners must take responsibility for identifying where multiple contractors work in proximity and enforcing SIMOPs coordination.
CON: ContractorsHWP: Hot Work PermitSOP: Operating Procedures
🔨 Safety Meeting Toolbox Talk
►Before you enter a confined space, how do you identify whether adjacent or connected spaces are occupied or have active work occurring that could create a hazard in your space?
►Does your facility have a formal SIMOPs coordination process identifying conflicts before work begins — or is coordination left to individual supervisors to negotiate informally?
►If a fire started in a connected confined space while you were working in an adjacent space, would you have a safe escape route and an alarm alerting you to evacuate?
►When multiple contractors work in the same area or connected areas, who is responsible for coordinating their work activities and managing simultaneous operation hazards?
►Have you ever entered a confined space and discovered another crew was working in a connected space that you did not know about? What did you do?
Immediate Action Items
✓Review your confined space entry procedure to confirm it requires identification of all physical connections, openings, and pathways to adjacent or connected spaces before a permit is issued.
✓Map the physically connected confined spaces at your facility — identify vessel systems, scrubbers, towers, and piping that share atmospheres or have fire propagation pathways between them.
✓Develop a SIMOPs coordination checklist for work involving multiple contractors in adjacent or connected confined spaces, requiring supervisor sign-off before work begins.
✓Audit your last five confined space entry permits to verify that connected space occupancy and adjacent work activity were evaluated as part of the permitting process.
✓Brief your confined space attendants and entrants on the Evergreen Packaging incident — ask them to identify connected spaces at your facility where a fire in one space could affect workers in an adjacent space.
🔗 PSM Failures Behind This Incident

This incident traced to breakdowns across 3 PSM elements (CON · HOW · SOP). Each represents a documented gap that process safety documentation and consulting can close before a similar event occurs at your facility.

Contractor Safety Management
Contractor workers must be held to the same PSM standard as employees. When contractor safety oversight fails, knowledge and compliance gaps follow contract workers onto your site.
Supporting documents in our library →
Hot Work Permits
Unauthorized or poorly controlled ignition sources near flammable atmospheres are entirely preventable. A rigorous hot work permit system with pre-job atmospheric testing closes this pathway.
Supporting documents in our library →
Operating Procedures (SOPs)
Operators cannot reliably hold safe operating limits without clear, current, enforced procedures. Deviation from acceptable operating conditions — a root cause here — is a direct consequence of SOP failure.
Supporting documents in our library →
Process Safety Management Consulting & Document Library
📂
PSM Document Library
72 ready-to-deploy PSM documents covering all 14 OSHA elements — procedures, checklists, and audit templates built for facilities operating under 29 CFR 1910.119.
Browse the Library →
📊
Free PSM Health Score
Find out where your PSM program stands across all 14 OSHA elements. Our free health score surfaces your biggest gaps in under 10 minutes — no account required.
Check Your Score →
📞
Consulting Services
PHA facilitation, PSM program builds, compliance audits, and OSHA inspection support. Scoped per project with a written proposal before work begins — no retainer required to get started.
View Pricing →
📋 Explore the full incident library: All 111 CSB Case Studies →