Hot Work — Oilfield Tank Explosion
Partridge-Raleigh Oilfield Explosion and Fire
Partridge-Raleigh, LLC / Stringer's Oilfield Services
📍 Raleigh, MS (Smith County)
Incident: June 5, 2006 • CSB Report: June 12, 2007
3
Fatalities
1
Seriously Injured
Flammable Hydrocarbon Vapor from Oil Production Tanks
Chemical / Hazard
4
CSB Recommendations
📋 Incident Summary

At about 8:30 a.m. on June 5, 2006, explosions and a fire at the Partridge-Raleigh oilfield in Raleigh, Mississippi, killed three contractors and seriously injured a fourth. All four were employees of Stringer's Oilfield Services, which Partridge-Raleigh had hired to relocate and connect oil production tanks.

Four tanks, 15 to 20 feet tall, stood in a line about four feet apart. Two workers and a foreman were on top of the tanks, using a ladder laid between two tanks as a makeshift scaffold, while a welder worked to attach a pipe fitting. Almost immediately after welding started, sparks ignited flammable vapor venting from an open-ended pipe on an adjacent tank about four feet away.

The fire flashed back into two tanks, and the pressure blew their tops off. The three workers on top were thrown and fatally injured. The welder survived with a broken ankle and hip because his safety harness kept him from falling. The CSB found that unsafe work practices caused the accident and that neither company required hot work permits. Its case study, released June 12, 2007, made 4 recommendations.

🔎 Key Findings
Finding 01
No Hot Work Permits Required
Neither Stringer's nor Partridge-Raleigh required hot work permits for welding on the tanks.
Finding 02
Open Pipe Not Capped or Isolated
The open-ended pipe on the adjacent tank was not capped or closed with a valve, so flammable vapor accumulated near the welding.
Finding 03
Unsafe Elevated Work
A ladder placed between two tanks was used as a makeshift work platform.
Finding 04
Unsafe Vapor Check Practice
The welder had checked for vapor by inserting a lit oxy-acetylene torch into the tank, a dangerous practice known as flashing, instead of using a flammable gas detector. The CSB noted this was not a cause of the accident.
Finding 05
No Hot Work Procedures; Standards Not Followed
Stringer's lacked hot work safety procedures and did not apply API 2009 guidance on safe welding and hot work; the companies did not follow OSHA safe welding requirements.
Finding 06
Little Regulatory Oversight
OSHA had not inspected either company in the three years before the explosion or conducted a planned inspection at any of Mississippi's nearly 6,000 oil fields in the preceding five years. After the explosion, OSHA cited Stringer's for 13 serious violations.
🔍 Root Causes
1
Hot work without hazard control
Welding was done next to an uncapped source of flammable vapor without a permit or gas testing.
2
No written safe work practices
The contractor had no written procedures for hot work, tank cleaning, or work at elevation.
3
Weak owner safety expectations
The owner had no written health and safety performance standards for work on its property.
☑ CSB Recommendations
→ Stringer's Oilfield Services
Develop and implement written procedures for safe hot work, tank cleaning, and work at elevated locations (2006-7-I-MS-1). Status: Closed — Acceptable Action.
→ Partridge-Raleigh, LLC
Establish written health and safety performance standards and metrics such as those in API RP 74 (2006-7-I-MS-2). Status: Closed — No Longer Applicable.
→ Mississippi State Oil & Gas Board
Establish a program to identify and refer unsafe health and safety conditions seen during field inspections to OSHA, with written procedures and inspector training (2006-7-I-MS-3). Status: Closed — Reconsidered/Superseded.
→ OSHA
Implement a Local Emphasis Program to inspect oil and gas production and extraction companies (2006-7-I-MS-4). Status: Closed — Acceptable Alternative Action.

Full recommendation text and current status: CSB investigation page.

💡 Lessons Learned
Any opening that can vent flammable vapor near hot work must be capped, isolated, or tested and monitored before work starts.
A flammable gas detector, not a torch, is the only acceptable way to check for vapor.
Owners are responsible for the safety of contractors on their property, including requiring hot work permits.
Work at elevation needs proper platforms and fall protection; a harness saved the welder's life.
HW: Hot WorkCON: ContractorsSOP: Operating Procedures
🔨 Safety Meeting Toolbox Talk
►Do contractors on our sites need a hot work permit for every job, including work on tanks and piping?
►How do we confirm that every nearby vent or open pipe is isolated before hot work?
►What gas detection is required before and during hot work?
►What platforms and fall protection do we require for work on top of tanks?
Immediate Action Items
✓Review contractor hot work requirements and confirm they apply to all tank work.
✓Add a check for nearby vents and open pipes to the hot work permit.
✓Prohibit flame-testing for vapors and require calibrated gas detectors.
🔗 PSM Failures Behind This Incident

This incident involved breakdowns across 3 PSM-related areas (HW · CON · SOP). Each represents a gap that process safety programs are designed to close.

Hot Work Permits
Hot work near flammable materials requires a permit, gas testing, and control of nearby hazards before any cutting or welding begins.
Supporting documents in our library →
Contractors
Contractors must know the process hazards, and their safety performance must be part of how they are selected and overseen.
Supporting documents in our library →
Operating Procedures (SOPs)
Operators cannot reliably hold safe operating limits without clear, current, enforced procedures. Deviation from acceptable operating conditions is a direct consequence of SOP failure.
Supporting documents in our library →
Process Safety Management Consulting & Document Library
📂
PSM Document Library
72 ready-to-deploy PSM documents covering all 14 OSHA elements — procedures, checklists, and audit templates built for facilities operating under 29 CFR 1910.119.
Browse the Library →
📊
Free PSM Health Score
Find out where your PSM program stands across all 14 OSHA elements. Our free health score surfaces your biggest gaps in under 10 minutes — no account required.
Check Your Score →
📞
Consulting Services
PHA facilitation, PSM program builds, compliance audits, and OSHA inspection support. Scoped per project with a written proposal before work begins — no retainer required to get started.
View Pricing →
📋 Explore the full incident library: All 111 CSB Case Studies →