On July 5, 2000, one worker was killed and three others were injured when a hydrocarbon release caused a fire and explosion at the Chevron Phillips Chemical Company facility in Sweeny, Texas. The facility produced petrochemical products including ethylene and propylene. The release occurred in a unit processing light hydrocarbons under pressure.
The release originated from a failure in process piping or equipment in the light hydrocarbon processing unit. The released material immediately ignited, producing a fire and explosion that killed one worker and injured three others. The worker who was killed was in the immediate vicinity of the release when it occurred.
The CSB investigation found deficiencies in the mechanical integrity program for the piping and equipment that failed, as well as process hazard analysis deficiencies in the identification of the specific failure scenario that led to the release. The investigation also found that operating procedures did not adequately address the hazardous conditions that existed in the unit at the time of the release.
This incident traced to breakdowns across 4 PSM elements (SOP · PHA · MI · TRN). Each represents a documented gap that process safety documentation and consulting can close before a similar event occurs at your facility.