Solvent Vapor Explosion — Community Damage
CAI / Arnel Chemical Plant Explosion
CAI, Inc. and Arnel Company
📍 Danvers, MA
Incident: November 22, 2006 • CSB Report: May 13, 2008
0
Fatalities
Dozens
Homes and Businesses Damaged
Heptane and Alcohol Solvent Vapor (Ink Mixing Tank)
Chemical / Hazard
11
CSB Recommendations
📋 Incident Summary

At about 2:45 a.m. on November 22, 2006, an explosion destroyed the CAI and Arnel facility in Danvers, Massachusetts. A CAI ink-mixing tank containing flammable heptane and alcohol solvents had been left heating overnight. It overheated, releasing vapor that filled the building and ignited. The blast wave damaged or destroyed dozens of nearby homes and businesses in the Danversport neighborhood.

The CSB found that CAI lacked safeguards, such as alarms and automatic shutoffs, that would have prevented the mixture from overheating while unattended. Based on the quantities of flammable materials it used, CAI was required to comply with OSHA's PSM standard. The facility was licensed for 6,000 gallons, but stored more than 20,000 gallons of flammable liquids and more than 50,000 pounds of nitrocellulose, and the fire department had not inspected it in more than four years.

The CSB also found that national model fire codes did not provide enough safeguards for flammable liquids heated inside buildings. The final report was approved May 13, 2008, with 11 recommendations.

🔎 Key Findings
Finding 01
Tank Left Heating Overnight
An ink-mixing tank of flammable solvents was left heating unattended overnight and overheated.
Finding 02
No Overheating Safeguards
There were no alarms or automatic shutoffs to prevent overheating.
Finding 03
Far More Material Than Licensed
The site was licensed for 6,000 gallons but stored over 20,000 gallons of flammable liquids and over 50,000 pounds of nitrocellulose.
Finding 04
No Recent Fire Inspection
The local fire department had not inspected the facility in more than four years.
Finding 05
Fire Code Gaps
Model fire codes did not explicitly require automatic shutdown or cooling for flammable liquids heated in tanks inside buildings.
🔍 Root Causes
1
Unattended heating of flammable liquid
Solvent vapor was generated with no one present and no automatic controls.
2
Lack of process safety management
CAI did not have the safeguards its PSM coverage required.
3
Weak regulatory oversight
Licensing and inspection did not catch the excess inventory.
☑ CSB Recommendations
→ CAI, Inc.
Develop a written process safety program, including prohibiting heating flammable liquids in unsealed tanks inside buildings and requiring overheating controls, if it resumes solvent-based operations.
→ NFPA and International Code Council
Revise NFPA 30, NFPA 35, and the International Fire Code to prohibit heating flammable liquids above their flashpoints in unsealed indoor tanks and to require overheating controls. (ICC did not act.)
→ Massachusetts legislature and public safety agencies
Require registrants to certify code compliance and re-register before increasing flammable quantities, list each hazardous material on license forms, adopt NFPA 30 and 35, set inspection intervals and criteria for manufacturing facilities, and audit local compliance.
→ Town of Danvers
Closed as no longer applicable.

Full recommendation text and current status: CSB investigation page.

💡 Lessons Learned
Never leave flammable liquids heating unattended without automatic shutoff.
Know and control your inventory; exceeding permitted quantities raises the consequences of any failure.
Heated flammable liquids indoors need closed, vented tanks and overheating protection.
Facilities near homes must consider blast effects on the community.
PHA: Process Hazard AnalysisSOP: Operating ProceduresMI: Mechanical IntegrityPSI: Process Safety Information
🔨 Safety Meeting Toolbox Talk
Topic: Flammable Solvent Vapor Hazards & Ventilation as Safety System
►Do we heat any flammable liquids, and what stops them from overheating?
►Is anything left running unattended overnight?
►Does our actual inventory match our permits?
►When did the fire department last inspect us?
Immediate Action Items
✓Install high-temperature alarms and automatic shutoffs on heated flammable vessels.
✓Reconcile inventory with permitted quantities.
✓Invite a fire department inspection.
🔗 PSM Failures Behind This Incident

This incident involved breakdowns across 4 PSM-related areas (PHA · SOP · MI · PSI). Each represents a gap that process safety programs are designed to close.

Process Hazard Analysis (PHA)
A structured PHA or HAZOP study exists to identify exactly these scenarios before they occur. When PHA is absent, superficial, or overdue for revalidation, hazards operate unseen until they kill someone.
Supporting documents in our library →
Operating Procedures (SOPs)
Operators cannot reliably hold safe operating limits without clear, current, enforced procedures. Deviation from acceptable operating conditions is a direct consequence of SOP failure.
Supporting documents in our library →
Mechanical Integrity (MI)
Equipment must be designed, inspected, and maintained to operate safely in its intended service. Mechanical integrity failures contributed to loss of containment here.
Supporting documents in our library →
Process Safety Information (PSI)
Accurate, complete Process Safety Information is the foundation every other PSM element depends on. When PSI is missing or wrong — chemistry data, equipment specs, P&IDs — the entire hazard analysis is built on a flawed base.
Supporting documents in our library →
Process Safety Management Consulting & Document Library
📂
PSM Document Library
72 ready-to-deploy PSM documents covering all 14 OSHA elements — procedures, checklists, and audit templates built for facilities operating under 29 CFR 1910.119.
Browse the Library →
📊
Free PSM Health Score
Find out where your PSM program stands across all 14 OSHA elements. Our free health score surfaces your biggest gaps in under 10 minutes — no account required.
Check Your Score →
📞
Consulting Services
PHA facilitation, PSM program builds, compliance audits, and OSHA inspection support. Scoped per project with a written proposal before work begins — no retainer required to get started.
View Pricing →
📋 Explore the full incident library: All 111 CSB Case Studies →