Hot Work Explosion — Slurry Tank
DuPont Buffalo Fatal Hot Work Explosion
E. I. du Pont de Nemours and Company — Yerkes Plant
📍 Tonawanda (Buffalo), NY
Incident: November 9, 2010 • CSB Report: April 19, 2012
1
Fatalities
1
Seriously Injured
Flammable Vapor Inside a 10,000-Gallon Slurry Tank
Chemical / Hazard
4
CSB Recommendations
📋 Incident Summary

On November 9, 2010, two contractors were welding on top of a 10,000-gallon slurry tank at the DuPont facility near Buffalo, New York, when hot sparks ignited flammable vapor inside the tank. The explosion killed one contractor and seriously injured the other.

The CSB found that DuPont overlooked hazards. Its recommendations required positive isolation and venting of all piping connected to tanks before hot work, and monitoring for flammable vapor inside the container before and during welding, cutting, or grinding, consistent with NFPA 326 and NFPA 51B.

The CSB approved its final report on April 19, 2012, with 4 recommendations. In 2013 the CSB commended DuPont's updated global hot work standard.

🔎 Key Findings
Finding 01
Flammable Vapor Inside the Tank
Hot sparks from welding on the tank top ignited flammable vapor inside it.
Finding 02
No Gas Monitoring Inside the Tank
The atmosphere inside the tank was not tested before or during the hot work.
Finding 03
Connections Not Isolated
The CSB recommended positive isolation of all connected piping, using closed valves, blinds, or blanks, and venting before hot work.
Finding 04
Permit System Gaps
The CSB recommended auditing hot work permits to ensure explosion hazards are identified and permits are properly approved.
🔍 Root Causes
1
Hazard not identified
The hot work permit did not identify the flammable vapor inside the tank.
2
No atmospheric testing
Vapor inside the container was not measured.
3
Inadequate isolation
Connected piping could allow flammable material into the tank.
☑ CSB Recommendations
→ E. I. du Pont de Nemours and Company (4)
Audit hot work permits to identify and mitigate explosion hazards; require positive isolation and venting of connected piping before hot work; require monitoring for flammable vapor inside containers before hot work; and require monitoring during hot work per NFPA 326 and NFPA 51B.

Full recommendation text and current status: CSB investigation page.

💡 Lessons Learned
Test inside tanks and containers for flammable vapor before hot work on or near them.
Monitor continuously or periodically while the work continues.
Isolate and vent all connections to a tank before hot work.
Hot work permits must be specific to the equipment and its contents.
HW: Hot WorkCON: ContractorsSOP: Operating ProceduresPSI: Process Safety Information
🔨 Safety Meeting Toolbox Talk
Topic: Hot Work Hazard Assessment & Chemical-Specific Gas Testing
►Do our hot work permits require gas testing inside tanks?
►How do we isolate connected piping before welding on a vessel?
►Who approves hot work permits?
►Do contractors understand these requirements?
Immediate Action Items
✓Add inside-the-container gas testing to hot work permits.
✓Require positive isolation before hot work on tanks.
✓Audit recent hot work permits.
🔗 PSM Failures Behind This Incident

This incident involved breakdowns across 4 PSM-related areas (HW · CON · SOP · PSI). Each represents a gap that process safety programs are designed to close.

Hot Work Permits
Hot work near flammable materials requires a permit, gas testing, and control of nearby hazards before any cutting or welding begins.
Supporting documents in our library →
Contractors
Contractors must know the process hazards, and their safety performance must be part of how they are selected and overseen.
Supporting documents in our library →
Operating Procedures (SOPs)
Operators cannot reliably hold safe operating limits without clear, current, enforced procedures. Deviation from acceptable operating conditions is a direct consequence of SOP failure.
Supporting documents in our library →
Process Safety Information (PSI)
Accurate, complete Process Safety Information is the foundation every other PSM element depends on. When PSI is missing or wrong — chemistry data, equipment specs, P&IDs — the entire hazard analysis is built on a flawed base.
Supporting documents in our library →
Process Safety Management Consulting & Document Library
📂
PSM Document Library
72 ready-to-deploy PSM documents covering all 14 OSHA elements — procedures, checklists, and audit templates built for facilities operating under 29 CFR 1910.119.
Browse the Library →
📊
Free PSM Health Score
Find out where your PSM program stands across all 14 OSHA elements. Our free health score surfaces your biggest gaps in under 10 minutes — no account required.
Check Your Score →
📞
Consulting Services
PHA facilitation, PSM program builds, compliance audits, and OSHA inspection support. Scoped per project with a written proposal before work begins — no retainer required to get started.
View Pricing →
📋 Explore the full incident library: All 111 CSB Case Studies →