A process hazard analysis is the backbone of a PSM program, and the first thing an inspector asks to see. SafeGuard PSM facilitates PHAs and HAZOPs for initial studies, 5-year revalidations, and capital projects, led by people who have operated the units they analyze.
OSHA's PSM standard, 29 CFR 1910.119(e), and EPA's RMP rule for Program 3 processes, 40 CFR 68.67, share the same core PHA requirements.
| Step | What happens |
|---|---|
| 1. PSI readiness check | Before sessions start, we confirm the P&IDs, relief design basis, safe operating limits, and chemical hazard data are current, so the team analyzes the plant as it actually is. |
| 2. Method and nodes | We match the method to the process: HAZOP for complex continuous units, What-If/Checklist for simpler systems. Nodes are defined with a clear design intent. |
| 3. Team roster | We confirm the team meets (e)(4): operations, engineering, an operator who knows the unit, and a facilitator who knows the method. We cover all operating modes, including startup, shutdown, and maintenance. |
| 4. Facilitated sessions | Deviations, causes, consequences, and safeguards, with each safeguard challenged: does it exist, does it work, and is it independent of the cause? |
| 5. Report and worksheet | A complete record addressing all seven (e)(3) topics, including facility siting and human factors, which are often thin. |
| 6. Recommendation follow-through | Each recommendation gets an owner, a date, and documented resolution. That's where the safety value is, and where inspectors look. |
See a full node worked through in our HAZOP worked example, built on a real CSB-investigated vessel failure.
A revalidation is a chance to fix what the last study missed, not just re-sign it. We review the previous PHA, changes since then (MOCs), and incidents, then update the study.
PHAs at design stages, then a PSSR that confirms recommendations were resolved before startup. For new facilities, the PHA must be done and recommendations resolved before start-up [1910.119(i)].
When an incident or compliance audit shows the PHA missed a scenario, we help rework the affected nodes and close the gap.
Tell us about your process and schedule. We'll help you scope the study, the team, and the timeline.
Talk to Us PSM Compliance Audits HAZOP Worked ExampleOSHA, 29 CFR 1910.119(d), (e), (i): eCFR
EPA, 40 CFR 68.67 and 68.10 (compliance dates): eCFR · EPA proposed rule, 91 FR 8970 (Feb 24, 2026): Federal Register
Not legal advice. Confirm requirements against the current regulations.